Product Details
Our company is a manufacturer specializing in container manufacturing. We have R& D and production of mixing station-related equipment , more than 10 years of production experience, and professional construction technicians. Our products are issued with inspection certificates and product manuals before leaving the factory, and we help customers install the accessories and transport them to the customer's designated location for direct use.
-------------------------------------------------- ----------------------------------------
Features
Bulk cement silo is a closed tank for storing bulk materials. It is suitable for storing various bulk materials such as grain, cement, fly ash, etc. The tank is equipped with a material level system that can display the location and amount of materials. The hole-breaking device can Eliminate the solidification caused by material settling for too long. The cement silo and screw conveyor pump can be used together to transport materials to various locations. The tank is easy to install, safe and reliable, and is an ideal bulk storage tank for various mixing stations.
-------------------------------------------------- ----------------------------------------
Product accessories
The cement tank is composed of the following parts: steel structure part of the warehouse, ladder, guardrail, feeding pipe, dust collector, pressure safety valve, high and low material level gauge, discharge valve, etc. The cement tank is a cylindrical structure, and the bottom is supported by four round pipes. The legs support the entire warehouse body, which is made of steel structure and welded; there is a dust collector and pressure safety valve on the top.
-------------------------------------------------- ----------------------------------------
Bulk cement tank series
1. Product introduction
Bulk cement tank is suitable for storing various dry small granular materials. It is a silo that occupies a small area and is easy to load and unload. It is commonly used to store bulk mud and is one of the equipment configured in a concrete mixing station.
-------------------------------------------------- ----------------------------------------
2. Basic parameters and dimensions
Li Fung Hong Model |
Specifications (t) |
Discharging height (mm) |
Comprehensive cycle of tank production (d) |
Tank satisfaction coefficient |
SN30 |
30 |
customize |
0.5 |
National standard |
SN50 |
50 |
customize |
0.5 |
National standard |
SN80 |
80 |
customize |
0.5 |
National standard |
SN100 |
100 |
customize |
1 |
National standard |
SN150 |
150 |
customize |
1.4 |
National standard |
SN200 |
200 |
customize |
1.8 |
National standard |
SN300 |
300 |
customize |
2 |
National standard |
. . . |
. . . |
. . . |
. . . |
. . . |
3. Welding requirements
a. Construction shall be carried out strictly in accordance with the drawings, plans and welding process instructions (independently designed by Shandong Lifengxing).
b. Give full play to the role of the quality assurance system and ensure the normal operation of the quality assurance system.
c. It is strictly prohibited to use welding materials without product certificates and material certificates. When there is doubt about the material, assays should be performed to determine whether it is usable.
d. Strengthen quality education and strengthen employees’ quality awareness.
e. Unlicensed personnel are strictly prohibited from performing welding work.
-------------------------------------------------- ----------------------------------------
4. Full water test and anti-corrosion
After the tank is made, completely fill the cement tank with water. After 2 to 3 hours, use a hammer weighing 0.5 to 1.5 kg to tap about 150 mm along both sides of the weld. If there is no leakage, it is qualified. If there is any leakage, Where necessary, it must be re-welded and then tested.
The anti-corrosion design of the outer surface of the cement tank should comply with the relevant provisions of the current national standard "Code for Design of Corrosion Control Engineering for Steel Pipes and Storage Tanks" and should adopt an anti-corrosion insulation protective layer of no less than reinforced grade; the anti-corrosion measures for the inner wall of the cement tank should be Determine based on the storage medium in the tank.
-------------------------------------------------- ----------------------------------------
5. Tank installation
a. First, according to the basic requirements of the design drawing, prepare the overall concrete foundation, bury the anchor bolts, and install the anchor bolt connecting plates. The four foot plates must be aligned on the same level. After the foundation is dry, tighten the nuts.
b. Check whether there is any damage or loose connections during transportation. They should be repaired and tightened.
c. Lift it into place (pay attention to the loading direction and escalator orientation), and weld the tank feet and the foot plate firmly.
-------------------------------------------------- ----------------------------------------
6. Use and maintenance
a. Open the discharge valve and check whether there is any debris in the tank before use.
b. When loading materials, close the discharge valve tightly first.
c. Frequently check whether the bag in the dust removal device has too much powder, which should be removed in time. If it is damaged, it should be replaced in time to avoid powder spraying when loading materials.